• Globe Online Store
    Factory-Direct Deal

>> >> >> >> >> 15cm Long Leads Battery Holder Box Case for 6x1.5V AA Batteries w Cap
15cm Long Leads Battery Holder Box Case for 6x1.5V AA Batteries w Cap

15cm Long Leads Battery Holder Box Case for 6x1.5V AA Batteries w Cap

  1. (Be the first to write a review)
  • Item number:
  • a13110400ux0705
  • Price: $7.69
  • 18in stock

    You can order at maximum the number of units in stock.
  • Free Shipping ( Wholesale Volume Discount )
  1. Product Desicription
  2. Shipping & Delivery
  3. Returns & Refund

Specification:

Product Name Battery Case
Material Plastic, Metal
Total Size 114 x 61 x 19mm/4.5" x 2.4"  x 0.75"(L*W*H)
Cable Length( Each ) 15cm/5.9"
Battery Type for 6 x 1.5V AA Battery(Not included here)
Color Black
Weight 42g
Package Content 1 x Battery Case Holder w Cover

Description:

  • This battery box holder with wire connector, fit for 6 x 1.5 V AA batteries.
  • Battery is not included here.
Note: Please do not separate, maintain, or refit the product.The wires are thin, and the structure of this product is only fit for very small current load, DO NOT connect it to a load that will cause large current, stop using this product if the wires are hot.
1. When the battery case is working, the maximum power should be less than 15W, the working current should be less than 2A.
2.Please pay attention to your battery heat generation while using this product and do not use the poor quality battery.

MPNDoes Not Apply
BrandUxcell
  • 1.Shipping Methods Comparison
  • SourcingMap currently has limited offers which let you enjoy free shipping by subsidized air transport.During this period,you can still enjoy discounted shipping if you choose to ship by UPS / EMS or registered air mail.
  • Shipping Method Local Delivery Costs Example
    (1 kg to USA)
    Transit Time Tracking Numbers Recommendation
    Subsidized Air Transport Post office Free Shipping US$0 Usually 7 - 15 working days Not available Best Value. Lowest cost but total shipping time varies depending on the destination. Tracking numbers are not available.
    Registered Air Mail Post office By weight and destination. Calculated By System Automatically 10 - 30 days Yes Slower than Subsidized Air Transport but includes tracking numbers.
    EMS (Speedpost) Post office By weight and destination. Calculated By System Automatically 3 - 5 days Yes More expensive but fast and trackable.
    UPS Express UPS By weight and destination. Calculated By System Automatically 2 - 5 days Yes Fastest. More expensive but fast and trackable.
    ** Typical time frame to most metropolitan areas. Some remote areas may take up to 30 days.
  • 2.How do I track my order?

    Simply click on My Account at the top of the site and log in if requested. Under Previous Orders, click the View button next to the order to see its current status.

    For orders shipped via REGISTERED MAIL, visit the Hong Kong Post Office website to track whether your package has left for your country. You will need to provide the tracking number shown in your Order History. Postal services in many countries around the world also provide online package tracking where you can use the same tracking number to track your package. USA, Canada, Spain and Brazil are among these countries. Click here for a list of postal service websites.

    For orders shipped via EMS (SPEEDPOST), visit the Hong Kong Post Office website to track your order using the tracking number provided in your Order History. On this page, you can select the destination country and determine the shipping status at your local postal service website.

    For orders shipped via UPS Express, visit the UPS Tracking Information page.

    Note that tracking information is not available for orders shipped via Subsidized Air Transport.

  • 3.Where is my SUBSIDIZED AIR TRANSPORT order?

    While Subsidized Air Transport offers you the best value for your money, transit time can vary from 3 days to 3 weeks for more remote, outlying areas. Typically, packages to most metropolitan areas take about 10 days. If it doesn't arrive after that amount of time, please contact us at Customer Service.

  • 4.Where is my REGISTERED MAIL order?

    REGISTERED MAIL takes a long time as a matter of process. The package needs to be registered in the Hong Kong Post Office, then in your local postal service. And finally it has to be delivered by your local postal workers. It is often over 2 weeks before the parcel shows up.

    In our experience, we are notified of many unclaimed items. This occurs when postal workers leave notices in your mailboxes to collect items from the post office and those notes are lost or overlooked. Please check with your local post office if your package seems to be missing.

    On some rare occasions, the package is stuck in customs. This will require you to make an inquiry at your local customs agency and possibly pay import duties. Please let us know if we can help clarify information invoices to customs.

  • 5.What is the website for the postal service in my country?

    Click on the following links to reach your postal service website:
    Hong Kong Post
    Spain
    US
    UPS Mail Innovations

  • 6.Can you send me a tracking number?

    We will send you a notification and tracking number via email when we ship your order. We do this for most shipping methods except Subsidized Air Transport, which doesn't offer tracking numbers. If you haven't received this email, it's probably that we haven't shipped your order, yet.

    It's also possible that the notification email has been trapped by a spam filter or landed in your spam folder. Please look there. You can avoid this problem by adding our email address info@sourcingmap.com to your email address book.

  • 7.Shipping Insurance

    We offer shipping insurance for orders placed in SourcingMap. If you have paid the shipping insurance during checkout, you item is insured and just in case it was lost during transit, we will re-ship the item to you.

  • 8.Import Tax and Duties

    As local laws, systems, codes and practices vary widely among countries, we are unable to collect any taxes or duties that your local authorities may impose upon you. This is the buyer's responsibility.

    If you are familiar with your local regulations, however, we will be glad to follow your instructions concerning labeling, packaging, and invoicing, to aid customs processing and appropriate tax assessments of your packages. Just leave these instructions in the comment box on your order so that our staff can follow them.

  • 9.Ship anywhere in the world(rare exceptions)

    We ship to anywhere in the world except the following regions:

    • • Most African countries
    • • Most Southeast Asia countries
    • • Argentina
    • • China
    • • Hong Kong, China
    • • India
    • • North Korea
1.What is your Return policy?
At Sourcingmap, your satisfaction is paramount - you will always enjoy a 14-day Money Back Guarantee. It works very simple. When you make a purchase with us, regardless of value, you can return the product(s) within 14 days from the date we first shipped your order for refund or replacement.
Whether the product is defective, seems defective, or that you change your mind and simply do not like it, you are welcome to send it back to us and we will issue you a FULL REFUND once we have received the product in question. Alternatively, you can choose a replacement of the same product or product of the same value.
However, the original and return shipping and handling charges will not be refunded or reimbursed under all circumstances. And we are not responsible for returned products lost in post.
To return your purchase, please inform us first at info@sourcingmap.com. Then fill out the RETURN FORM on the back of your invoice and return it together with your purchase to:
SourcingMap
Unit B, 2/F, High Fashion Centre,
1 - 11 Kwai Hei Street,
Kwai Chung,
Hong Kong
For assistance, please contact us at or call us at info@sourcingmap.com 1800 741-1388 (US) 0203 355-1257(UK) +86 755 29620083 (Worldwide).
2.How do I track my order?
We require all factories that offer products on SourcingMap to provide warranty coverage on everything they sell. This coverage extends to the consumers that purchase the products from you. We know, however, that dealing with hundreds of factories on warranty service would be nearly impossible for you, let alone your customers, so SourcingMap will take care of all that on your behalf. Our promise is that all warranties will get honored, even if we have to honor them ourselves.
For the length of time shown here, the warranty covers parts and labor for the repair or replacement of products due defects in materials or workmanship under normal consumer usage. This excludes normal wear and tear, defects from abuse or misuse, and software modifications including firmware flashing..
MP3/MP4 players 3 months
Cell phones 1 year
Cell phone batteries 6 months
Cell phone accessories Lifetime
All other products 3 months
During the term of the warranty, customers may return defective merchandise for repair or replacement to their place of purchase or directly to SourcingMap. If a customer contacts you regarding defective merchandise, we'd suggest you help the customer through the basic troubleshooting instructions provided on this site. Should that not work, you may contact us to request warranty service, and we'll send you a Return Merchandise Authorization (RMA) form to be included with the return. All returns must be accompanied by an RMA.
Your customer may also request warranty service directly from SourcingMap by contacting us at info@sourcingmap.com. We'll send a Return Merchandise Authorization (RMA) form directly to your customer and work directly to his or her satisfaction..
3.Where is my SUBSIDIZED AIR TRANSPORT order?
SourcingMap.com understands that quality issues and returns hurt your business, both in terms of your customers' satisfaction as well as your bottom line. Such issues are unacceptable but unfortunately inevitable given our high volumes. Nonetheless, your loss is our loss and we are in this together. We are committed to preventing quality issues from leaving the factories and remedying them when they do.
The high standards we place upon our member factories include providing us detailed information on product usage, issues and troubleshooting. We have provided this information on this site, so that you, too, can be fully knowledgeable about the products you sell. We encourage you to empower yourself with this knowledge so that you can solve customer issues on the spot. We also rely on you to provide us open and honest feedback, so that we in turn can demand more improvements from the factories.
Customer Reviews
  • Average Customer Review (0 customer reviews)
  • 5
  • Write Review
  1. (0)
  1. (0)
  1. (0)
  1. (0)
  1. (0)
1.Tell us what you think about this item.Write a comment on this product and share your opinion with other people.Please make sure that your review focus on this item.
2.You can earn reward points when you login in and write a review.
3.Your review will become effective within 24 hours.
Write a review for 15cm Long Leads Battery Holder Box Case for 6x1.5V AA Batteries w Cap
  • Rating:
  1. NOTE:
  2. HTML is not translated!
Your View History
You have not viewed any products, let's go now!
close
Copyright © 2006-2025 SourcingMap Ltd. All Rights Reserved.